Video and Sound Production: Project 2 - Exercise 2: Movie Trailer
Felice Lee (0381272)
Video and Sound Production / Bachelor of Design (Hons) in Creative Media / Taylor's University
Project 2
INSTRUCTION
PROGRESS
My class were separated into 2 groups for production shoot, I was in the yellow team and I choose my role as an actor
Fig 2.2 Storyboard
Sample/reference of each scene:
Next, we arrive at the studio, prepare and set up all tools we need and start shooting. This process took us 3-4 hours.
Fig 2.3 Behind the scene
After, we done with all of the recordings, my team upload all of the video, audio, and photos in google drive and share it to group. Drive: https://drive.google.com/drive/folders/1exMDizEHbbpuYx1yjykK9sqoBDSUJEaC
Next, we get into editing. I choose the video that I want from the drive, then I import it all into premiere pro to cut and adjust it. Done with trimming, I proceed to find some sound effects and trailer music in freesound website an input it. Next, I put some effects like light leaks, flickering lights, dim to black, and some texts.
Fig 2.4 Editing progress
Lastly, after I feel everything is okay, I do color correction to my video, export it and post it on youtube.
SUBMISSION
Youtube link: https://youtu.be/XK5WPbPBtEw?si=ZnD7MWdzi-RLp81U
Comments
Post a Comment